When Is The LandCruiser Available? How to Jump the Queue!
The 70 Series is consistently supply-constrained. This guide covers current realistic wait times and what buyers are doing to shorten them.
1. Current Wait Times (2026)
Workmate Single Cab Chassis: 6 to 12 months from dealer order. 79 GXL Dual Cab: 12 to 18 months. 76 Wagon GXL: 9 to 15 months. 78 Troopcarrier GXL: 9 to 15 months. Times vary significantly by state, dealer allocation and specific build configuration.
2. Why the 70 Series Is Supply-Constrained
The platform is produced for the global commercial market and Australian allocation is a portion of total production. Demand consistently exceeds supply. Specific colour and option combinations have additional production constraints.
3. Strategies to Jump the Queue
Call multiple dealers nationwide - allocation varies by state and region, and a dealer in a quieter market may have stock or shorter waits than a metropolitan dealer. Accept non-preferred colours or trim levels - white Workmate Single Cabs typically have shorter waits than premium-trim configurations.
4. Cancelled Orders
Dealers regularly have cancelled orders that need new buyers. Joining 70 Series owner Facebook groups and calling dealers weekly increases the chance of catching a cancellation. Sometimes a cancelled order is available immediately at the original quote price.
5. Used Market as an Alternative
If waiting is not feasible, the used market is healthy. A 1-3 year old 79 Series in good condition typically sells at or near new driveaway price. Some buyers prefer used (V8 era specifically) for the engine choice. Wait time is zero.
Frequently Asked Questions
What is the current wait time for a 70 Series?
6 to 18 months depending on variant and trim. Workmate Single Cab fastest; GXL Dual Cab longest.
How can I get a 70 Series faster?
Call multiple dealers nationwide, accept non-preferred colours/trims, watch for cancelled orders, join 70 Series Facebook groups.
Are wait times shorter now than during V8 supply constraints?
Yes. The 2024 transition to the 2.8L reset the supply pipeline. Peak V8 waits reached 2+ years.